Award Winning
Excellence in Construction Eagle Award.
Frost Bank Tower
MK Marlow provided the metal stud interior and exterior framing, insulation, sheetrock, and specialty ceilings for the new $142 million dollar Frost Tower. Overall project included building the tower and a 1,000-space wraparound parking facility. Frost Tower is designed to achieve LEED® Silver certification and features high-efficiency light fixtures, low-emitting materials, low-flow plumbing fixtures, water-efficient landscaping, and electric car charging stations. The first skyscraper to be built in San Antonio in nearly three decades, it was designed by renowned architecture firm Pelli Clarke Pelli. This magnificent structure serves as the new corporate, regional headquarters for Frost Bank.
Category
Offices, Retail
Location
San Antonio, Texas
General Contractor
Clark Construction
Services
Acoustical Ceilings, Drywall, Insulation, Metal Stud Framing, Specialty Wall Panels